Pedestal Mount
- Unlike traditional deck railing which must be installed inside or outside of the deck’s frame in order to provide adequate stability, DryJoist’s Structural Rail System can be installed anywhere on the deck at 4” on-center. no professional crews needed
Simply place a Pedestal Mount anywhere on the deck’s surface so that it’s positioned to span a triangle joint. #14 SS fasteners can be drilled through the deck’s surface boards and directly into the pre-positioned (link) Anchor Clips, permitting the Pedestal Mount to span and attach at either side of a structural support. install overtop deck planks - easily integrates rail system into the deck’s frame - i.e. rail becomes structural
This method successfully transfers perpendicular stress into parallel shear loads for exceptional load capacity without the hassle of trimming around rail posts, blocking the frame, additional $ for hardware or brackets, weak attachments to the deck’s rim or strength degradation due to notched rail posts.
Rail Post
- Meeting national safety standards and codes, 3”x3” Rail Posts are available 36” in height for rail applications in single family homes and 42” in height for multifamily housing units or buildings such as condos or apartments. attractive, safe, secure and meets deck guardrail requirements for local building codes
Post Cap
- The Post Cap’s traditional style provides a finished appearance to your deck’s railing system.
Picket Rails
- 1” Pickets are pre-assembled in between the handrail and bottom rail to provide infill for the deck’s guardrails - 3 ½” spacing between pickets, 4 ½” on-center. Horizontal and angled sections are available in 2’ / 4’ / 6’ / or custom lengths.
Top Rail
- The Top Rail or handrail provides an easy-to-grip, smooth surface and the high thermal conductivity of aluminum coolest option available for railing applications combine to make the handrails perfectly comfortable to the touch – even on the hottest summer days. The design of the pre-assembled sections will not permit the handrails to rattle, become shaky or loosen overtime.
Bottom Rail
- The Bottom Rail is attached 4” above the deck’s surface to allow snow and leaf debris to be easily swept off the deck’s surface.
Fixed Rail Mount
- The proprietary design creates a solid and long lasting connection between the horizontal pre-assembled rail sections yes, we have angled sections for stairs and posts. The subtle design {skinny / slim} is color matched and provides a low profile attachment method.
Hinged Rail Mount
- The proprietary design facilitates quick and easy positioning for securing stair guardrails – which is often the most difficult step during stair rail installation on second story or raised decks. The Hinged Rail Mount is color matched and the subtle design provides a low profile attachment method.

